PROJECT DESCRIPTION |
CLIENT |
CONTRACT
SUM (RM) |
CONSULTANT/ MAIN CONTRACTOR |
DATE |
|
Electrical
Services Installation for Extension on
Production Area |
Dell
Asia Pacific |
137,000.00 |
Hock Kheng
Construction Sdn. Bhd. |
2006/2007 |
|
Package
610 – 33/11KV Substation |
Advanced Micro Devices Export Sdn.
Bhd.
No.7A,
Jalan Kampung Jawa, Bayan Lepas FTD,
Phase 3. |
5,000,000.00 |
M.E.I.
Consultants Sdn. Bhd. |
2006-2007 |
|
Set up and
Retrofit KM3 Lab Fit Up |
Intel
Products (M) Sdn Bhd |
1,600,000.00 |
Pen
Konsult Sdn bhd. |
2006 |
|
Level 2
Clean Room Fit-Up Works (Phase 1A) |
Advanced Micro Devices Export Sdn. Bhd.
No.7A,
Jalan Kampung Jawa, Bayan Lepas FTD,
Phase 3. |
4,000,000.00 |
Polycool
HTE Engineering Sdn. Bhd. |
2006-2007 |
|
Electrical
Works/PA/Telephone/IT System for Hoya
Phase 2 Project |
Hoya
Electronics Malaysia Sdn. Bhd.
Lot 28
& 29, Phase 1 Jalan Hi-Tech 4, Kulim
Hi-Tech Park 09000 Kulim Kedah Darulaman,
Malaysia. |
2,500,000.00 |
T.T.E.
Engineering (M) Sdn. Bhd. |
2007 |
|
Yearly
Maintenance S Plant |
Penang
Seagate (M) Sdn. Bhd.
Phase
III, Bayan Lepas FTZ, PG. |
- |
As
Client’s Specification |
2006-2007 |
|
Proposed
Alteration and Additions (new
Auditorium) to Existing Factory and
Office Building. |
Jabil
Circuit Sdn. Bhd.
(Plant
1) Plot 56, 58(a), 58(b) and 58(c),
Mukim 12, S.W.D., Bayan lepas, Penang. |
158,000.00 |
AE Advance
Engineering & Construction Co. Sdn. Bhd |
2007 |
|
Proposed
Design and Build for Carsem Technology
Centre at Carsem-S Site Building ‘N’
Level 3 |
Carsem
(M) Sdn. Bhd.
S – Site
Lot 52986, Taman Meru Industrial Estate,
Jelapang. P.O. Box 380, 30720 Ipoh,
Perak, Malaysia. |
671,000.00 |
Polycool
HTE Engineering Sdn. Bhd. |
2007 |
|
Level 3 -
Package 600 MEP Works |
Advanced Micro Devices Export Sdn. Bhd.
No.7A,
Jalan Kampung Jawa, Bayan Lepas FTD,
Phase 3. |
900,000.00 |
Polycool
HTE Engineering Sdn. Bhd. |
2007-2008 |